Skip to main content
MENU

Milton Interchange Park

The site features wooded flat terrain consisting of lakeland sand and clay soil in a minimal flooding zone (Flood Zone C.) The site is zoned light Industrial and surrounded by land zoned Commercial, Restricted Industrial, Agricultural, and Military. It’s also located within an Airport Zone and a Wellfield Protection Area.

Acreage186 Developable; Contiguous
CountySanta Rosa
CityMilton
Latitude, Longitude30.611064, -86.952925
Airport25 miles from Pensacola International Airport (PNS)
Port28 miles from the Port of Pensacola
RailSite is not rail serviced
Interstate & U.S. HighwayLess than 1 mile from I-10 & accessed by Hwy. 87
ElectricFlordia Power and Light: 12.47 kV 3-phase distribution line 200 feet from the park
Natural GasCity of Milton: 2-inch line
WaterCity of Milton: 8-inch line with 435,000 gpd available capacity
SewerWastewater lines within 500 feet of the park; 8.5 mgd available capacity
TelecommunicationsAT&T Florida: Infrastructure within 500 feet of the park

The Milton Interchange Park has access to Interstate 10 at exit 31, providing easy access to the entire northern Gulf Coast. Interstate 65 is less than an hour away for access Northward. Two-lane highways with controlled intersections provide access from the east and west, and north into Alabama.

The deep-water Port of Pensacola sits 25 miles away along the Gulf of Mexico and is Northwest Florida’s most diverse and business focused deep-water port. The port boasts a 33-foot channel depth with a 2-foot overdraft and a 1,600-foot turning basin radius.

The Pensacola International Airport provides passenger, charter, and air cargo services within a 30-minute drive. Peter Prince Field sits just two miles away from the site and offers full-instrument- landing-capable general aviation airport services with a 3,700-foot runway.

The Florida First Sites program is designed to add project-ready industrial sites to Northwest Florida’s portfolio of competitive advantages.

Site certification…

  • Offers a detailed analysis by an international site selection firm
  • Completes due diligence items
  • Reduces risk factors
  • Accelerates speed to market
  • Cuts site development costs

 

Studies Completed

  Title Search
  Phase I Environmental
  Wetlands Delineation
  Geotechnical Study
  Archaeological Study
  Endangered Species

 

Amenity Quick-Check

  Project-ready site
  Immediate interstate access
  Foreign trade port access
  Full utilities coverage
  Telecommunications coverage
  No noise restrictions
  No wetlands or water